- The Thompson River Snow Sheds in HOThis is a project that has been sitting in the back of my mind for too long. I wanted to do some rugged mountain modeling with cliff faces that would be impressive to look at. I was too short on space to create a floor to ceiling mountain range but I knew some compromise could be found. I also knew there had to be grade built into my plan in order to avoid the mountains blocking my previous scenery. To do this I had to settle on a rather steep down grade to drop six inches below my current track level. A four percent is what it came out to be. Such a steep grade means helper service which just added to the appeal of this project.The snow sheds along the Thompson River are an iconic sight for the few remaining passenger trains that follow the route along the CN line. One of those trains is the Rocky Mountaineer which can just barely span the series of tunnels and sheds. They have taken a brilliant panoramic shot of their train spanning those sheds which I have been using to get my version as close to the real one as possible (see figure 1).Figure 1- Basic foam mountain faces with Rocky Mountaineer panorama in the back ground. Panoramic photo source: Rocky Mountaineer [1].
For me there was no time to waste in beginning this project, I did up a quick drawing of the proposed route and began construction (see figure 2). The benchwork was really just a simple shelf design, nothing pretty as the mountains will overhang and the skirting will cover the rest. I won’t go into any particulars about how I constructed the benchwork but rather I will lean towards the scenery techniques used through this series of blogs.Figure 2- Plan for the Thompson River route along current layout.
With the benchwork complete, I went straight cutting some basic mountain faces from foam. The foam I used was salvaged from a roof repair, unfortunately for me this foam was fiberglass based and I was left with some irritated hands after avoiding the use of gloves. The foam itself did a great job though and being several inches thick it didn’t take long to build up the six inches of mountain face I was able to have. I tried to keep the foam carving rough to make the future plaster work as easy as possible. This is where a hot wire cutter (and some better foam) would come in very handy as it would keep the mess down and allow you to be even more creative with how you cut the foam. For the tunnels I drew an approximate track center line along the table top and used a tri-level auto-rack to make sure I had sufficient clearance through the tunnels. An NMRA gauge is also a good tool for this, however be careful as it won’t properly gauge the overhang around a tight curve. With the pieces of foam fully cut out (see figure 3), I secured them to the layout with a generous amount of hot glue (however I left the tops of the tunnel sections off until the track has been secured). There are certainly stronger glues you could use but I haven’t had any issues with hot glue, especially when the track work isn’t relying on the rigidity of the foam. If you are laying your track on a foam base I would strongly advise a glue which will cover the entire surface between the layout and the foam. It should also have enough flexibility to hold up to any flex and movement the layout may be put through.Figure 3- Basic foam design of the tunnels.
Once the foam was finished, I began laying cork roadbed along the entire length of my Thompson river route. You could use foam roadbed which I’ve done it in the past, however I have grown to prefer the rigidity of cork and I feel it will keep the track level and aligned better than the foam will (with a 4% grade even the smallest of issues could be dangerous). To secure the road bed I used contact cement which provides a quick yet strong hold. I used Atlas code 83 cement tie flex track for the entire route. The concrete ties are prototypical to that portion of the CN line and has a very contemporary look which fits my modern layout well. To secure the track I used a very hot glue gun. It must be “very hot” to avoid any lumps if the glue has cooled before the track was properly laid. The hot glue is again quick which was important to me (being an engineering student, time is always at a premium). I soldered every rail joint to ensure good electrical connection, operational reliability, and realism because the prototype has welded rail meaning there should be minimal “click-clack.”This project has been a lot of fun so far and I look forward to its completion along with every other step along the way. Hopefully I have inspired some of you to tackle that mountain railroading project you’ve been imagining. With some careful planning it doesn’t have to take up much space and in return it will cost you less in plaster. With the next blog I will begin the task of creating snow sheds and tunnel portals, as well as begin the plaster rock-work and show some other little details I have been adding. Lastly I would like to say that while I am modeling a prototype location and wish to be as accurate as possible, I don’t mind missing a few details along the way, it’s the big picture that I’m aiming for. So if I have misinterpreted any facts along the way I apologize and would be very interested in hearing about how it should really be from you guys. I will likely even change what I’ve done if it’ll help make this project as realistic as possible.
[1] Rocky Mountaineer Rail Tours owns the panorama seen in the photo, this is not my own image. Rocky Mountaineer (Copyright 2011).
This is Tyler's Layout. He works at our South store and is part of the FREE-MO group. Please feel free to come down to our South store to talk to him, Jesse, John or Rob; at our North store Ross, Leigh or Ken.
Wednesday, 5 December 2012
An HO Layout In Progress
This layout is by Tyler who works at our South store.
Subscribe to:
Post Comments (Atom)
great post!
ReplyDeleteThanks for taking the time to read and post on our blog! Tyler is hoping to give us some updates during his Christmas vacation.
ReplyDelete